30/45/55kw Tunnel Axial Fan

Product Details
Customization: Available
Material: Iron, Stainless Steel, FRP, Plastic, PP PVC
Usage: for Experiment, for Air Conditioner, for Manufacture, Mine, Tunnel, Underground Project
Still deciding? Get samples of US$ 100/Piece
Request Sample
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
10500000 RMB
Plant Area
>2000 square meters
  • 30/45/55kw Tunnel Axial Fan
  • 30/45/55kw Tunnel Axial Fan
  • 30/45/55kw Tunnel Axial Fan
  • 30/45/55kw Tunnel Axial Fan
  • 30/45/55kw Tunnel Axial Fan
  • 30/45/55kw Tunnel Axial Fan
Find Similar Products
  • Overview
  • Product Description
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
HQSDF
Flow Direction
Axial Flow
Pressure
Low/Midium/High Pressure, Customised
Certification
RoHS, ISO, CE, CCC
Speed
2900 R/Min, 1450r/Min, 960r/Min
Air Flow
35-210 M3/S
Wind Pressure
500-8000 PA
Power
30-500kw
Efficiency
90%
Impeller
Iron, Stainless Steel, Mn-Steel, Cuprum, Customize
Impeller Testing
Dynamic Blancing Adjusting
Fan Casing Silencer Material
Iron, Stainless Steel, Mn-Steel, Cuprum, Customize
Bearing
Zwz, C&U...
Color
Red/White/Grey/Yellow.... Customized
Transport Package
Wooden Case
Specification
According to the order
Trademark
HANQI
Origin
Shandong, China
Production Capacity
500000pieces/Year

Product Description

30/45/55kw Tunnel Axial Fan

Product Description
30/45/55kw Tunnel Axial Fan
30/45/55kw Tunnel Axial Fan
30/45/55kw Tunnel Axial Fan
30/45/55kw Tunnel Axial Fan
Fan Model Air volume
(m³/min)
Pressure(pa) Maximum airflow(m³/min) RPM (r/min) Highest power(KW) Maximum motor power (KW)
SDF(B)-4-9.6 680-1325 500-3200 1100 1480 58 30×2
SDF(B)-4-10 770-1500 550-3500 1225 1480 71 37×2
SDF(B)-4-10.5 891-1736 606-3859 1415 1480 85.5 45×2
SDF(B)-4-11 1015-1985 624-4150 1550 1480 107 55×2
SDF(B)-4-11.5 1171-2281 727-4628 1863 1480 135 75×2
SDF(B)-4-12.5 1550*2912 878-5355 2385 1480 216 110×2
SDF(B)-4-13 1695-3300 930-5920 2691 1480 259 132×2
SDF(B)-4-14 2113-4116 1078-6860 3361 1480 300 160×2
SDF(B)-6-14 1399-2725 473-3100 2226 980 110 75×2
SDF(B)-6-15 1721-3352 543-3559 2738 980 156 90×2
SDF(B)-6-16 2088-4068 618-4049 3323 980 206 110×2
SDF(B)-6-17 2505-4879 697-4571 3986 980 293 160×2
SDF(B)-6-18 2973-5792 782-5124 4731 980 389 200×2
SDF(B)-6-19 3210-6175 829-5412 5045 980 407 220×2
SDF(B)-6-20 3465-6684 878-5820 5478 980 472 250×2
SDF(B)-6-22 4158-8020 1010-6926 6552 980 596 315×2
SDF(B)-6-24 4948-9550 1192-8173 7730 980 685 355×2

30/45/55kw Tunnel Axial Fan30/45/55kw Tunnel Axial Fan
Company Profile

30/45/55kw Tunnel Axial Fan30/45/55kw Tunnel Axial Fan30/45/55kw Tunnel Axial Fan30/45/55kw Tunnel Axial Fan
FAQ

Q. What's the information should I provide when inquiry?
A: Flow rate&Air Volume
B: Pressure
C: Purpose
D: Use environment(Temperature, atmospheric pressure)
Or other specials you give us will be more appreciated.

Q. What is your warranty?
A.Our warranty is 12 months after received the centrifugal fans. During the warranty period, replace the damaged parts for free of charge. Out warranty period, to provide timely, high-quality technical services and price concessions spare parts to ensure
continuous safe and high-quality equipment operation.

Q. How does your factory control product quality?
A.We have quality inspection department. All blowers are running more than 3 hour before delivery to test the quality. If there is quality problem, we will produce new one.

Q. What are your terms of payment?
A. TT 40% AS THE ADVANCE PAYMENT AND TT 60% AFTER INSPECTION BEFORE SHIPPING.
B. 100% IRREVOCABLE L/C AT STGHT.

Q. What products do you produce?
A. Centrifugal fan, tunnel fan, axial fan, jet fan, mining fan, exhaust fan,anti-corrosion blower, high pressure blower, explosion proof fan, etc, welcome to contact us to learn more details.

Q. Where is your factory? Can i visit your factory?
A. Our factory is located in Zibo, Shandong, welcome to visit our factory.

Q. How long will it take to ship after order?
A. 20~30 days for one container.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier